Ultra-high Speed Closure Production System
- Model:
- CAP series
Detail Specifications / Descriptions
In this series, the newly launched FCS-CAP16/28 closure production system uses a 16-cavity mold for mineral water bottle caps. The system's cycle time has been shortened substantially to 4.5 to 4.8 seconds, breaking the record of 6.1 seconds for this industry. The monthly output for this efficient system is 9 million caps.